S-HOUSE, Tsukuba
Progress has been made on installing the stuctural plywood to stabelize the structure. This is the boarding that can be seen on the outside. Also the insulation material was delivered on site.
Progress has been made on installing the stuctural plywood to stabelize the structure. This is the boarding that can be seen on the outside. Also the insulation material was delivered on site.
The whole wood structure is delivered on site pre-cut and is installed in a matter of a day. This is the first time the whole volume of the house can be perceived. The proportions look pretty much as I had imagined. All
水曜日の時点;現場の状況です。