Blog

ブログ

NEBUTA NO IE WARASSE 100929

Progress of the construction of the multi-purpose spaces on the second floor.

The foyer at L2. from this area the theater/event hall as well as the Nebuta Museum is accessed.

The steel screens that separate the reference area from the Nebuta hall.

Overview of the Nebuta hall from the second floor.

The music rehearsal spaces. This large spaces will have movable separation wall in order to be able to split the hall into three smaller ones. A large sliding door allows for a connection to the Nebuta hall in the eventuality of events in which a combined use is required.

The construction progress of the cafe & restaurant. To the right the frame of the counter

the Entrance hall.

The Nebuta will access the Nebuta hall through these large sliding door. They are at this moment being finished.

The west facade is nearing completion.

A view of the ambulatory on the west side. The light of the afternoon sun filters through the ribbons and doubles in the reflection of the glazing.